Swedish Oak ready to build interior |
|
|
|
|
|
|
|
|
|
|
|
|
Underside of deck (upside down October 2004) |
|
|
|
|
|
|
|
|
|
|
|
|
Preparing the fibreglass Oct 04 |
|
|
|
|
|
|
|
|
|
|
|
|
Cutting the matting October 04 |
|
|
|
|
|
|
|
|
|
|
|
|
foreward shower compartment oct 04 |
|
|
|
|
|
|
|
|
|
|
|
|
Laying up the hull October 04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Preparing to glue the floor in place October 04 |
|
|
|
|
|
|
|
|
|
|
|
|
Laminating the floor inplace October 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Completed Deck November 04 |
|
|
|
|
|
|
|
|
|
|
|
|
Completed deck November 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Completed Deck November 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Still in the mould November 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A ply mock up of one of the bulkheads November 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Completed bulkhead prior to installation |
|
|
|
|
|
|
|
|
|
|
|
|
Completed deck Novemer 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Completed deck November 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
completed deck November 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Completed deck November 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Looking towards the stern from inside the hull november 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Building the ply mock up of the bulkhead |
|
|
|
|
|
|
|
|
|
|
|
|
Still in the mould Nov 30th 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
|
5,800 kg keel with stainless bolts |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Laying up the bulkheads December 3rd 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Laying up the bulkheads December 3rd 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Laying up the bulkheads December 3rd 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bulkheads in laminated in situ 9th December 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Bulkheads in laminated in situ 9th December 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
Bulkheads in laminated in situ 9th December 2004 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lowering deck into position |
|
|
|
|
|
|
|
|
|
|
|
|
Lowering deck into position |
|
|
|
|
|
|
|
|
|
|
|
|
Lowering deck into position |
|
|
|
|
|
|
|
|
|
|
|
|
Lowering deck into position |
|
|
|
|
|
|
|
|
|
|
|
|
Now installed in main fitting out shed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Deck now bolted to hull |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Deck now bolted to hull |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Deck now bolted to hull |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Coach roof still missing |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, View of transom |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Divinyl foam insulating deck |
|
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Companion way |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Deck saloon minus coach roof from bow |
|
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Forward Sail locker |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, escape hatch from starboard aft cabin beneath cockpit seat |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, The two lazarette lockers aft |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, One of the bulkheads |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Mast bulkhead |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Entrance into aft starboard cabin |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, The Navigation station will be where Damien is standing and raised saloon is in front of him |
|
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Entrance into Port aft cabin (to be enlarged!) |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Bulkheads on which the bed will rest starboard aft cabin |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Bulkheads supporting the raised saloon |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Bulkheads supporting the raised saloon |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, Entrance to foreward cabin |
|
|
|
|
|
|
|
|
|
|
|
|
January 30th 2005, One of the starboard saloon windows |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Henan Marina March 14th 2005 |
|
|
|
|
|
|
|
|
|
|
|
|
MArch 14th 2005 Forward port berth |
|
|
|
|
|
|
|
|
|
|
|
|
March 14 2005. Forward starboard berth |
|
|
|
|
|
|
|
|
|
|
|
|
May 21st 2005
|
|
|
|
May 21st 2005
|
|
|
|
May 21st 2005
|
|
|
|
May 21st 2005
|
|
|
|
|
|
Galley May 28
|
|
|
|
Heads May 28
|
|
|
|
Toe rail May 28
|
|
|
|
Work room May 28
|
|
|
|
|
|
Engine
|
|
|
|
Engine Number
|
|
|
|
Work Room June 2nd 2005
|
|
|
|
|
|
Upper bunk in work room
|
|
|
|
Upper bunk in work room June 9th 2005
|
|
|
|
|
Generator platform in work room
|
|
|
|
June 9th 2005
|
|
|
|
|
Owners Cabin June 9th 2005
|
|
|
|
|
Sail locker with bow thruster hole June 9th 2005
|
|
|
|
|
|
|
|
|
|
|
June 10th 2005
|
|
|
|
|
Krista
|
|
|
|
Hole for bow thruster
|
|
|
|
|
|
Tanks ready to instal
|
|
|
|
Auxilliary diesel tank under bed in aft cabin
|
|
|
|
Installin main diesel and water taks
|
|
|
|
Generator in work room
|
|
|
|
Upgrade to large double sink
|
|
|
|
|
Cupboard below settee accessed from galley
|
|
|
|
|
|
6/7/05 Generator installed
|
|
|
|
6/7/05 Auxilliary diesel tank installed
|
|
|
|
6/7/05 Some of the wiring being installed behind chart table
|
|
|
|
6/7/2005 Bowthruster installed and forward looking sonar transducer
|
|
|
|
|
|
Elecricity control box and fuses to toggle between battery, shorepower and generator circuits
|
|
|
|
Manufacturing the rudder with sacrificial lower third
|
|
|
|
Manual bilge pump
|
|
|
|
Starboard steering position
|
|
|
|
Gas regulator and solenoid
|
|
|
|
|
Deck saltwater pump
|
|
|
|
Bow t | |